Post-tensioned slabs
Solid, ribbed and flat slabs for residential and commercial buildings and multi-storey car parks: longer spans, thinner sections and lighter dead loads.
Smart Cities Contracting Co.
10-year warranty on design and execution
A Saudi limited liability company based in Riyadh that does post-tensioning (PT) work and nothing else. We work with main contractors, consultants and owners across the Kingdom on projects that need longer spans, thinner slabs and shorter schedules.
One contract covers the whole cycle: design review and alternative proposals, shop drawings, installation and stressing, then elongation reports, grouting and final documentation.
Download company profile (PDF)Anchorage system with ETA 15/0507 approval and CE marking.
Member of the Post-Tensioning Institute, working to its guides.
On design and execution together: one contract, one point of responsibility.
Elongation reports, stressing and grouting records ready for the consultant.
Post-tensioning isn't something you bolt on at the end of design. It's an engineering decision made early, and it changes the whole building: longer spans with fewer columns, thinner slabs that save concrete and steel, and an extra floor within the same permitted height.
Our value starts at the first meeting where we review the drawings, not at the first tendon we stress. That's where the time and cost savings are decided, and where we become partners in the decision rather than just the people who carry it out.
Our aim is for the industry in the Kingdom to reach the day the question is asked the other way round: why didn't we use post-tensioning on this project?
Tendons are laid inside the slab on a calculated curve: high over the columns, low at mid-span, held on chairs at exact heights.
Concrete is poured around the tendons. Under load, any slab tends to sag at mid-span. That is where stressing comes in.
Once the concrete reaches the required strength, each tendon is stressed with a hydraulic jack and locked in its anchor. The curved profile pushes up against the load, so the slab sags and cracks less.
Slabs up to 20% thinner, up to 50% less reinforcement, and longer spans with fewer columns.
Solid, ribbed and flat slabs for residential and commercial buildings and multi-storey car parks: longer spans, thinner sections and lighter dead loads.
To carry loads where the column grid changes between floors.
Post-tensioned rafts that cut thickness and rebar quantities and limit shrinkage cracking.
Circular tanks and structures that need to be watertight and highly resistant.
We study the conventional design and propose a post-tensioned alternative, comparing quantities, cost and schedule.
Tendon and chair layout drawings, quantity take-offs, elongation reports and stressing and grouting records.
Tower
Tower
Tower
Tower
School
School
Mall
Bridge
MosquePost-tensioned areas as listed in the company profile.
Headquartered in Riyadh, with projects across every region of the Kingdom.
European-approved anchorage systems and international professional membership keep every installation to specification.

ETA 15/0507
European Technical Assessment for the anchorage system we use.
CE
European conformity marking on the stressing system components.

PTI
Member of the Post-Tensioning Institute, working to its guides.
Post-tensioning isn't an add-on service for us. It's the only work we do.
From design review to the stressing report, with no responsibility split between suppliers.
ETA-approved, CE-marked anchorages, with conformity documents ready for the consultant.
Take-off and detailing tools built in-house that reduce errors and speed up drawing issue.
Elongation reports and stressing and grouting records in an approved format that shortens review cycles.
We study the post-tensioned alternative and compare quantities and schedule before you commit to a design.



Developers, main contractors and owners we work with across the Kingdom.




















Post-tensioning is a way of reinforcing concrete with high-strength steel tendons laid inside the slab on a calculated curve: high over the columns and low at mid-span. Once the concrete reaches the required strength, each tendon is stressed with a hydraulic jack and locked in its anchor. The curved profile pushes up against the load, so the slab sags and cracks less.
Slabs up to 20% thinner, up to 50% less reinforcement, and longer spans with fewer columns. That saves concrete and steel, lightens dead loads, and can fit an extra floor within the same permitted height.
Post-tensioning only: solid, ribbed and flat slabs for residential and commercial buildings and multi-storey car parks, beams and transfer plates, foundations and rafts, tanks and special structures, plus design review with post-tensioned alternatives, shop drawings and documentation.
Our head office is in Riyadh (Al Manar district, Imam Al Shafi'i Street) and our projects are across the Kingdom, including Riyadh, Jeddah, Dammam, Al Khobar, Madinah, Al Ahsa and Abha. We have delivered more than 300 projects and more than 5 million m² of post-tensioned slabs.
One contract covers the whole cycle: design review and alternative proposals, shop drawings, installation and stressing, then elongation reports, grouting and final documentation. We give a 10-year warranty on design and execution together, with one point of responsibility.
We use an anchorage system with a European Technical Assessment (ETA) and CE marking, and we are a member of the Post-Tensioning Institute (PTI), working to its guides.
Send us the structural drawings and we will come back with a post-tensioned alternative and a comparison of quantities and schedule. Reach us by phone, WhatsApp or email at info@smartcitiespt.com, Saturday to Thursday, 8:00 to 17:30.
Send us the structural drawings and we'll come back with a post-tensioned alternative and a comparison of quantities and schedule.
Working hours: Saturday to Thursday, 8:00 to 17:30
Al Manar district, Imam Al Shafi'i Street
Riyadh 14221, Saudi Arabia